Home
About Us
Services & Projects
Photo Album
Testimonials
Contact Us
Feedback Form
   
 


Professional Services :

*  Fire Prevention
*  Fire Code Compliance & Fire Audit
*  Process Design
*  Piping design, flow sheets, P & ID, Iso's
*  Civil/Structural
*  Pre-Start Health and Safety Review
*  Industrial Engineering
*  Mechanical, HVAC, Sewer Systems
*  Electrical and Instrumentation
*  Project Engineering
*  Project Management
*  Architectural
*  Permit applications (BCIN No.)
*  Computer-Aided Drafting (Auto CAD)

Types of Projects :

*  Tank Farm Installation
*  Flammable Storage Facilities
*  Explosion Proof Buildings
*  Buildings and Building Extensions
*  Piperacks
*  Plastic Extrusion Projects
*  Food Processing Plants
*  Chemical and Petrochemical Plants
*  Packaging Plants
*  Pre-Start Health and Safety Review
*  Pharmaceutical Plants
*  Productivity Improvement Projects
*  Press Installation and Foundations
*  Truck Loading Stations
*  New Mezzanines
*  Process Systems
*  Plot Plan Development
*  Power Distribution Systems
*  Compliance equivalency - Part 4 Fire Code

SAMPLE PROJECTS

PSR - Pre-Start Health and Safety review for :

  • Tank Farms
  • Buildings and Tank Rooms
  • Dispersion Tank room
  • Filling Line and Palletizer Area
  • Manufacturing Areas
  • Lifting machines
  • Chemical Storage building
  • Explosion Proof Building

 Fire Prevention, Audits and Fire Code Compliance for

  • Manufacturing Building and Tank Room
  • Red Label Room
  • Flammable Storage room
  • Compound Room

 Sample Descriptions of some recent Projects in the Greater Toronto Area :

1.      Food Processing Plants

  • Cooler & Shipping Dock Expansion - approx. construction value - $3 Million
  • Warehouse expansion - approx. construction value - $1.5 Million
  • Milk Bay & Shipping Dock Expansion
  • Taco shell plant
  • Crystals installation plant

2.      Packaging Plants

  • Plant restructuring - Project construction cost over $15 Million
  • Roof Raising
  • Numerous Printing Press Foundations
  • Process / Piping Design
  • Oxidizer foundation and ducting
  • Compressor / Chiller Mezzanine
  • Tank Farm upgrade - Dyke containment for solvent tanks, pumping stations, piping, electrical, pipe bridge and supports
  • Press Foundations incl. Structural steel, HVAC and electrical design - Construction Cost $1.0 Million
  • Structural Steel supports and modifications
  • Baghouse Facility installation
  • Road Paving
  • Cyclone, dumpster and compactor installation
  • Solvent Wash and storage facilities
  • Study for new Ink dispensing room
  • New HVAC system
  • Miscellaneous Engineering work around the plants

3.      Paint Plants

  • Design of Manufacturing and Filling Building- Construction Cost $4 million
  • Design of Drum storage facility
  • Site:Design of paving, slopes and drainage of the entire yard and parking lot
  • Design of Dispersion tank and electrical room buildings
  • Design of 10,000 sq.ft. structural mezzanine
  • Project management of construction
  • Design of roof reinforcement to support HVAC units
  • Design of Control lab
  • Design of new offices & Lunch room
  • Fire Audit (Part 4 of Fire Code) for Alkyd Manufacturing Building and Tank Room
  • Pre-Start Health and Safety Review, Tank Farm
  • Pre-Start Health and Safety Review, Alkyd Manufacturing Building and Tank Room
  • Study for office building extension
  • Truck Loading stations
  • Truck Scale
  • Design of Red Label Rooms - 2 hour fire rating
  • Design of Class II/III Rooms
  • Occupancy Permit
  • Fire Audit (Part 4 of Fire Code) for Red Label Room
  • Fire Code Compliance Equivilancy for Red Label Room

4.      Pharmaceutical Plants

  • Chiller Supporting Structure
  • Lab design
  • Flammable storage room
  • Solvent Dispensing and storage building
  • Pre-Start Health and Safety Review
  • Oncology Facility (approx. $2.5 Million) including Press Room, Granulation Suite, Coater installation, Chiller Platform Structure
  • Explosion Proof building study
  • New lab
  • New Building Expansion
  • Office layout
  • Second Floor addition ($1.5 Million)
  • Complete Reconstruction of Pharmaceutical Plant
    - re-design of buildings, docks, equipment foundations, tank foundations, tank farm, structural steel, electrical, P&ID's, piping, mechanical, pipe racks, cooling tower, spray dryer, instrumentation, HVAC, and drainage.
    - Explosion proof buildings
    - Procurement of all equipment; vessels, pumps, agitators….etc.
    - Obtain permits and supervise construction
    - Total cost of project - approximately $5.5 million

5.      Chemical / Petro Chemical Plants

  • Solvent Tank Farm extension and modification: - design for tanks, foundations, dyke & piping to meet Fire Codes, Ministry of Labour (MOL) and Ministry of Environment (MOE) approvals - Construction Cost $400,000.00
  • Design of new equipement structure
  • Structural check and reinforcement design of existing equipment support
  • Sludge filter project - Structural, mechanical, process, instrumentation & electrical design and construction supervision - Construction Cost $200,000
  • EPI Tank installation - Complete design engineering for the tank, piping, foundation, instrumentation and electrical - Construction Cost $200,000.00

6.      Industrial Plants

Constant Design Engineering services since 1978. Some projects are as follows:

  • Tank Farm extension - Involving 6 130,000 Imperial gallon tanks, incl. design of piping, mechanical, vessels, instrumentation and electrical disciplines, procurement and project management - Construction Cost $1.5 Million
  • New White Oil Tank Farm - 9 stainless steel tanks, Loading and unloading station and drum loading station (conveyer system), Complete design and project management - Construction Cost $1.8 Million
  • Blend Tank Farm - 2 Tanks, dykes, piping, electrical, instrumentation - Construction Cost $1.0 Million
  • White Oil and Petrolatum plants - Tanks, Piping, Dykes, Electrical, Instrumentation & Load cells - Construction Cost $500,000.00
  • Railway Paving - Civil/Structural design and project management - Construction Cost $350,000.00
  • Baghouse and facility installation
    Railway dock - Phase I civil/structural design and project management - Construction Cost $200,000.00
  • Tank replacement - Vessels, piping and civil design - Construction Cost $250,000.00
  • Plant piping modifications - Construction Cost $250,000.00
  • HVAC for various buildings
  • Drum loading station
  • Truck loading station
  • Emulsion Pilot Plant
  • Sprinkler systems for various buildings
  • Power Distribution plans - Design engineering for power distribution of the entire plant - Consisted of 25 full size electrical drawings
  • Traffic Control system
  • Plot plans - Developed plot plans and under ground drawings for the entire plant
  • Miscellaneous - maintenance type projects around the plant on a continuous basis

7.      Productivity Improvement Project to generate and implement cost reduction projects, Improve customer service, enhance the performance and quality of operations, assist in development / implementation of Total Operations Productivity (TOP) action plan.:

Chemical Plants - Productivity Improvement Project

  • Material Flow & Handling Study
  • A Study to improve the efficiency of Painting and H-testing of Gas cylinders
  • A Study to improve the efficiency of orders assembly and evaluation of the overall plan operation efficiency
  • General Productivity Improvement including empty cylinder sorting, order forms and order processing
  • A study estimating productivity standards for hydrotest, shotblast and cylinder repairs
  • Redesign of filled cylinder stockroom for improvement of labor efficiency and productivity